The operating partner for real assets

Real estate.Under one standard.

Facility operations, investment management and advisory. Coordinated around the asset.

The operating record connects the work on site to the decisions that shape its value.

Architectural study / 30 storeysScroll to enter the asset

The Mistral standard / Architectural study

Where the work happens.

From arrival to the crown, explore 30 floors of connected operations. Every level contributes to the same operating record.

Skip the journey
One building / One record01 / 09
Illustrative systems / authored technical zone

Inspect one authored zone in the building, or use the accessible system diagram ↓.

Scroll through the building, or select a chapter.

01 / The asset in context

Welcome to the operating view.

Enter the building and follow the spaces, systems and decisions that keep an asset working.

Level
All 30 floors
Operating focus
The asset in context

02 / Arrival & occupier experience

The day begins here.

Reception connects visitors, occupiers and the site team. Access and the day’s requirements are understood before work begins.

Level
Floor 1
Operating focus
Arrival & occupier experience

03 / Facility coordination

The work finds its owner.

At the coordination desk, requests become a clear scope, a schedule and a named person responsible for delivery.

Level
Floor 2
Operating focus
Facility coordination

04 / Technical operations

Behind every reliable space.

Engineering teams inspect equipment, diagnose faults and record the condition of the systems people depend on.

Level
Floor 3
Operating focus
Technical operations

05 / Project delivery

A clear brief becomes action.

The project team brings the site plan, approved cost and trade expertise together before work proceeds.

Level
Floor 4
Operating focus
Project delivery

06 / Building services

Keep the building running.

Specialist teams maintain the equipment that supports comfortable, dependable spaces throughout the asset.

Level
Floor 9
Operating focus
Building services

07 / Investment & advisory

The operating record informs value.

At the investment table, recurring cost, condition and approved works inform the next capital decision.

Level
Floor 16
Operating focus
Investment & advisory

08 / Portfolio operations

The wider picture stays connected.

Teams compare the work across assets, carry successful practices forward and identify what needs attention next.

Level
Floor 24
Operating focus
Portfolio operations

09 / Long-term stewardship

A considered next move.

The record supports the next maintenance decision, the next capital plan and the next stage of ownership.

Level
Floor 30
Operating focus
Long-term stewardship

The whole asset in view

One standard.
From work to value.

Explore capabilities

01 / Beneath the surface

A building is morethan its facade.

Illustrative architectural study

Trace the systems behind a dependable space. Reveal one representative floor, then explore what each system asks of the team that looks after it.

Study 01 / Technical floorOne floor · Three systems
Beneath the Surface: an illustrative floor study An axonometric floor diagram with occupied rooms around a service corridor. A mechanical air handler connects to ducts and air terminals; electrical switchgear connects to distribution paths and fixtures; a water riser connects to supply and return branches. These are authored schematic routes, not the engineering records of an actual property. The same systems are explained in the adjoining notes. N SCHEMATIC / NOT TO SCALE AXONOMETRIC STUDY 01
One floor. A connected operating picture.Authored routes · No live property data

Static study: all three systems are shown together in the drawing and described in the notes. Interactive scanning is available when JavaScript loads.

This architectural illustration uses authored system routes and equipment. It is not an as-built record, a live monitoring view or an engineering drawing for site work.

The work in view

Every signal has context. Every next move has an owner.

A practical operating picture makes it easier to see what is changing at the asset, decide what matters, and carry the work through to a clean close.

1 view

One operating picture across the asset, people, service partners and work.

10 trades

A consistent standard across the core technical disciplines of a reliable building.

6 divisions

Connected expertise from everyday delivery to capital advice.

Illustrative signals

Illustrative live work activity: HVAC inspection cleared at Facility Operations, electrical contractor scheduled at Service Coordination, fire-system testing complete at Technical Services, and roof survey awaiting approval at Project Management.

Why Mistral Ops

Accountability, carried through the work.

The record explains what happened, who owned it, what was approved and how the job closed. The same evidence can then inform the wider portfolio.

01 / Context

Evidence at the source.

Scope, cost and photographs are recorded against the work order.

02 / Focus

A comparable portfolio.

Consistent records make recurring cost and condition patterns easier to assess.

03 / Control

Continuity beyond the handover.

The maintenance history remains with the asset when a team or manager changes.

For owners & occupiers

An accountable view of the asset.

See the scope, approved cost and status of the work, with the evidence needed to assess the result.

For service partners

The context to do the work well.

Receive a clear brief, agreed access and a visible cost ceiling. A named coordinator stays with the job through completion.

How it works

From the request to the record.

Mistral makes the operating rhythm visible from first signal to final handoff.

01Define the engagement

Record the address, observed issue, scope, schedule window and cost ceiling.

02Assign accountability

One coordinator owns the work order from dispatch through closeout.

03Confirm the right trade

Match the work with a qualified partner and agree site access.

04Approve changes in writing

If the required work exceeds the agreed figure, pause and obtain approval.

05Verify the outcome

Attach completion evidence and review the result against the scope.

06Carry the history forward

Keep the intervention, its cost and any recurring fault in the asset record.

Connected capabilities

Six divisions. One operating record.

Six divisions share the operating history that connects a building’s daily work with its longer-term value.

Explore capabilities